WORK IN PROGRESS

...

NESIMA-MISTERBIANCO TUNNEL

NESIMA-MISTERBIANCO TUNNEL

The "OF" System will be installed to monitor: the stress condition and deformation of the tunnel segments; the convergence values in four tunnel secti ...

SEWEGE SYSTEM COLLECTOR - MILAN

SEWEGE SYSTEM COLLECTOR - MILAN

Installing the "OF" System to monitor the water temperature into the sewage collector and detect the presence of infiltrations from outside by thermal ...

PERFORMED WORKS

TORBELLA BRIDGE - HIGHWAY A/7 GENOA-SERRAVALLE

TORBELLA BRIDGE - HIGHWAY A/7 GENOA-SERRAVALLE

The "OF" System is being installed on Torbella bridge to monitor the stress conditions, the deformations and the bridge vertical displacement, when ve ...

“LA RINASCENTE” PALACE

“LA RINASCENTE” PALACE

The "OF" System has been installed to monitor deformations, inclinations, vibrations and imbalances of the new building facade, and deformations of th ...

DRILLING WELL

DRILLING WELL

Installing the "OF" System to monitor the temperature changes of the concrete walls of a borehole, during the cooling cycles with pressurized water. F ...

ANCIENT ROMAN AQUEDUCT

ANCIENT ROMAN AQUEDUCT

The "OF" System has been installed to monitor the movements of the ancient roman aqueduct “Vergine” section, located below the structure under rec ...

BUILDINGS SURROUNDING THE “LA RINASCENTE” PALACE

BUILDINGS SURROUNDING THE “LA RINASCENTE” PALACE

The "OF" System has been installed to monitor the inclinations of four perimeter buildings, during demolition and reconstruction of the new building. ...

TUNNEL VAL DI SAMBRO

TUNNEL VAL DI SAMBRO

The "OF” System has been designed and installed in Val di Sambro tunnel, with the aim of controlling its convergence and longitudinal deformations, ...

« »